GSA CONTAINERS FOR SALE
BY SAFETRENDS
Your Subtitle text
CONTAINER INSPECTIONS

This photograph (above) is of all three containers after final inspection. The re-certification label and locks are the last to go on.




This photograph (below) is a GSA four drawer and a two drawer container that has been completely dismantled, painted, inspected.

 




This is a photograph (below) is of a another two drawer GSA container that has just been re-painted black. This had a suspension problem that caused the control drawer to fail.

When the custodian of this container could not close the control drawer, they slammed the drawer several times, causing paint damage to the container, and drawers.

Using a surplus suspension, that we had in stock, the control drawer has been repaired, and operates as designed.

 

 




Before a GSA container can be sold, it has to be inspected. This photograph (above) is the end product.

This photograph (below) is of three GSA containers being serviced . This process is detailed, checking each part for any defect, in which it will be repaired or replaced. All GSA containers are cleaned, lubed, inspected before they can be sold.


 
Another photograph (below) of parts ready for inspection.